您当前的位置:
首页 >
文章列表页 >
Distributed Assembly Hybrid Flow Shop Scheduling with Dual Resource Constraints
更新时间:2026-11-05
    • Distributed Assembly Hybrid Flow Shop Scheduling with Dual Resource Constraints

    • China Mechanical Engineering   Vol. 37, Issue 7, Pages: 1725-1733(2026)
    • DOI:10.3969/j.issn.1004-132X.2026.07.022    

      CLC: TP182
    • Received:27 November 2024,

      Revised:2026-04-06,

      Published:25 July 2026

    移动端阅览

  • ZHAO Cai,WU Lianghong.Distributed Assembly Hybrid Flow Shop Scheduling with Dual Resource Constraints[J].China Mechanical Engineering,2026,37(7):1725-1733. DOI: 10.3969/j.issn.1004-132X.2026.07.022.

  •  
  •  

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Intelligent Decision-making for Assembly Processes of Micro-device Products
Simulation and Experimental Study on Electrothermal Behavior of SPS-sintered Si3N4-based Composite Ceramic Tool Materials with Conductive Reinforcing Phase
Simulation and Parametric Study of Process‑performance of PH-SPR Steel/Aluminum Joints
Fault Diagnosis for Wind Turbine Pitch System Based on Generative Adversarial Data Augmentation and Multimodal Feature Fusion
Research on Removal Mechanism of μ-LAM of ZnSe Crystal

Related Author

SHI Lingling
DU Yimin
GUO Lili
ZHANG Zhijing
JIN Xin
LI Jiadi

Related Institution

School of Mechanical Engineering, Beijing Institute of Technology
0