您当前的位置:
首页 >
文章列表页 >
Dynamic Flexible Job Shop Scheduling Problem Considering Transportation Resource Constraints and Adaptive Competitive Reconfiguration Algorithm
更新时间:2026-11-05
    • Dynamic Flexible Job Shop Scheduling Problem Considering Transportation Resource Constraints and Adaptive Competitive Reconfiguration Algorithm

    • China Mechanical Engineering   Vol. 37, Issue 7, Pages: 1708-1716(2026)
    • DOI:10.3969/j.issn.1004-132X.2026.07.020    

      CLC: TP182
    • Received:20 June 2025,

      Published:25 July 2026

    移动端阅览

  • WANG Cong,WEI Lixin,SUN Hao,et al.Dynamic Flexible Job Shop Scheduling Problem Considering Transportation Resource Constraints and Adaptive Competitive Reconfiguration Algorithm[J].China Mechanical Engineering,2026,37(7):1708-1716. DOI: 10.3969/j.issn.1004-132X.2026.07.020.

  •  
  •  

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Docking Trajectory Planning Based on Improved Multi-objective Particle Swarm Optimization for Mobile Robots
Fuzzy Flexible Job-shop Scheduling Optimization Approach Considering Customer Satisfaction
Influence of Curved Segment Guideway Parameters on Maglev Vehicle-Bridge Coupled Dynamics
Effect of Rivet Structure on Friction Riveting Process and Mechanical Behavior of CFRP/Titanium Alloy Joints
Dynamic Modeling and Characteristic Analyses of Multi-Fault Coupling in Mechanical Meta-action Unit

Related Author

JIANG Xingyu
YANG Guozhe
LIU Bang
YANG Zhigang
LIU Shun
LIU Weijun
LIU Dan
GUAN Yuan

Related Institution

School of Mechanical Engineering, Shenyang University of Technology
Nanjing High-Speed Gear Manufacturing Co., Ltd.
State Key Laboratory of Mechanical Transmission for Advanced Equipment,Chongqing University
College of Mechanical and Vehicle Engineering, Chongqing University
College of Mechanical Engineering, Chongqing Technology and Business University
0