您当前的位置:
首页 >
文章列表页 >
Integrated Scheduling for Flexible Job Shops with Heterogeneous Transport Resources
更新时间:2026-11-05
    • Integrated Scheduling for Flexible Job Shops with Heterogeneous Transport Resources

    • China Mechanical Engineering   Vol. 37, Issue 7, Pages: 1695-1707(2026)
    • DOI:10.3969/j.issn.1004-132X.2026.07.019    

      CLC: TH165
    • Received:18 June 2025,

      Published:25 July 2026

    移动端阅览

  • ZHANG Guohui,WANG Wendi,YU Nana,et al.Integrated Scheduling of Flexible Job Shop Problem with Heterogeneous Transportation Resources[J].China Mechanical Engineering,2026,37(7):1695-1707. DOI: 10.3969/j.issn.1004-132X.2026.07.019.

  •  
  •  

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on the Influence of Transient Planet Gear Deformation on Dynamic Characteristics of Planetary Gear Train System
Flow Field Simulation and Experimental Study of Jet Electrolyte Plasma Micro-machining on TC4 Titanium Alloy
英文目次
Fault Diagnosis for Wind Turbine Pitch System Based on Generative Adversarial Data Augmentation and Multimodal Feature Fusion
Dynamic Modeling and Characteristic Analyses of Multi-Fault Coupling in Mechanical Meta-action Unit

Related Author

No data

Related Institution

No data
0