浏览全部资源
扫码关注微信
中国计量大学质量与标准化学院,杭州,310018
Received:18 June 2024,
Revised:2026-05-18,
Published:25 July 2026
移动端阅览
徐新胜,吴松泽,杜文,等.考虑低碳的柔性作业车间分批调度方法[J].中国机械工程,2026,37(7):1686-1694.
XU Xinsheng,WU Songze,DU Wen,et al.A Low-carbon Flexible Job Shop Scheduling Method with Lot Splitting[J].China Mechanical Engineering,2026,37(7):1686-1694.
徐新胜,吴松泽,杜文,等.考虑低碳的柔性作业车间分批调度方法[J].中国机械工程,2026,37(7):1686-1694. DOI: 10.3969/j.issn.1004-132X.2026.07.018.
XU Xinsheng,WU Songze,DU Wen,et al.A Low-carbon Flexible Job Shop Scheduling Method with Lot Splitting[J].China Mechanical Engineering,2026,37(7):1686-1694. DOI: 10.3969/j.issn.1004-132X.2026.07.018.
0
Views
下载量
CSCD
Publicity Resources
Related Articles
Related Author
Related Institution