您当前的位置:
首页 >
文章列表页 >
Simulation study on body-end effector reachable workspace of the hazard elimination robot in underground tunnel construction
更新时间:2026-10-13
    • Simulation study on body-end effector reachable workspace of the hazard elimination robot in underground tunnel construction

    • Engineering Journal of Wuhan University   Pages: 1-10(2026)
    • DOI:10.14188/j.1671-8844.2025.0145    

      CLC: TU94
    • Online First:13 October 2026,

    移动端阅览

  • WANG Fengqi, JIN Lianghai, PENG Zhongwen, et al. Simulation study on body-end effector reachable workspace of the hazard elimination robot in underground tunnel construction[J/OL]. Engineering Journal of Wuhan University, 2026, 1-10. DOI: 10.14188/j.1671-8844.2025.0145.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Design and simulation of derrick climbing robot
Kinematic modeling and analysis of wrecker manipulator of power line inspection robot
Research on method of obstacle-passing robot without touching based on the model
A prediction method for dissolved gas concentrations in transformer oil based on VMD-SSA-LSSVM
Analysis on the geological adaptability of the TBM selection for the water conveyance tunnels of the Yangtze River to Han River Water Diversion Project

Related Author

LU Zhizhong
CHEN Guang
YAO Maojiang
FENG Wenrong
GE Liang
WANG Weijie
HU Weijun
YAN Yu

Related Institution

Nanchong Key Laboratory of Robot Engineering and Intelligent Manufacturing, Southwest Petroleum University, Nanchong
School of Power and Mechanical Engineering, Wuhan University
Hunan Provincial Live Working Center of State Grid
College of Mechanical Engineering,Hubei University of Technology
0