您当前的位置:
首页 >
文章列表页 >
Analysis method of shear lag effect of twin⁃cell box girder
更新时间:2026-10-19
    • Analysis method of shear lag effect of twin⁃cell box girder

    • Engineering Journal of Wuhan University   Vol. 59, Issue 9, Pages: 1458-1468(2026)
    • DOI:10.14188/j.1671-8844.2023.0522    

      CLC: U 441;U 448.213
    • Received:26 February 2024,

      Published:15 September 2026

    移动端阅览

  • ZHOU Shijun,SHI Yu’an,ZHOU Cao,et al.Analysis method of shear lag effect of twin⁃cell box girder[J].Engineering Journal of Wuhan University,2026,59(9):1458-1468. DOI: 10.14188/j.1671-8844.2023.0522.

  •  
  •  

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Theoretical analysis of shear lag warping displacementfunction of box girder
Influence of radius and depth of biomimetic dimples on aerodynamic drag reduction of high‑speed train
Study on prediction methods and laws of ground settlement for super large diameter shield tunnel in shallow⁃buried composite strata
Numerical analysis of pile running of monopile foundation for offshore wind turbines
Numerical simulation research on the influence of void size on flow velocity around the spur dike

Related Author

Pinghe AN
Xiaoguang WU
Yuanxu SHI
Yue YIN
XU Jianlin
LI Yue
ZHANG Chunbo
LI Rui

Related Institution

Xi’an Highway Research Institute
School of Highway, Chang’an University
School of Mechanical Engineering, Lanzhou Jiaotong University
Wuhan Urban Construction Group Construction Management Co., Ltd.
China Railway 14th Bureau Group Mega Shield Construction Engineering Co., Ltd.
0