您当前的位置:
首页 >
文章列表页 >
A Wellbore Integrity Evaluation Method for Old Wells Converted to Injection Wells Based on FAHP and CRITIC
OIL AND GAS FIELD DEVELOPMENT ENGINEERING | 更新时间:2026-11-04
    • A Wellbore Integrity Evaluation Method for Old Wells Converted to Injection Wells Based on FAHP and CRITIC

    • China Petroleum Machinery   Vol. 54, Issue 10, Pages: 109-117(2026)
    • DOI:10.12473/CPM.202511046    

      CLC: TE357
    • Received:16 November 2025,

      Revised:2026-04-25,

      Accepted:31 January 2026,

      Published:25 October 2026

    移动端阅览

  • Wu Qingyao,Lian Wei,Li Jun,et al.A wellbore integrity evaluation method for old wells converted to injection wells based on FAHP and CRITIC[J].China Petroleum Machinery,2026,54(10):109-117. DOI: 10.12473/CPM.202511046.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

6

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Corrosion Experiment and Material Optimization Study of Tubing and Casing in Bohai D Oilfield
Expandable Tube-Suspended Recompletion Technology for Gas Injection Wells in Basement Reservoirs,Chad
Prediction of Casing Wear Depth Based on RGPSO-LightGBM
Calculation and Optimization of Instantaneous Safety Factors for Casing in Thermal Recovery Wells of Liaohe Oilfield
Research on the risk assessment method for wellbore integrity in casing section

Related Author

Xu Tao
Xiao Yao
Hu Jinyang
Jia Lixin
Li Jin
Zhong Zhao
Liu Jitong
Qu Zhaofeng

Related Institution

State Key Laboratory of Offshore Oil Exploitation
Tianjin Branch of CNOOC (China) Co., Ltd.
中国石油集团工程技术研究院 中国石油国际勘探开发有限公司
西安石油大学机械工程学院 西安市高难度复杂油气井完整性评价重点实验室中国石油集团渤海钻探工程有限公司油气井测试分公司
北京信息科技大学自动化学院 北京信息科技大学现代测控技术教育部重点实验室北京工业大学城建学部 昆仑数智科技有限责任公司
0