您当前的位置:
首页 >
文章列表页 >
Safety Evaluation Method for Casing Running in Deep Shale Gas Horizontal Wells
THEMATIC PAPER | 更新时间:2026-01-19
    • Safety Evaluation Method for Casing Running in Deep Shale Gas Horizontal Wells

    • China Petroleum Machinery   Vol. 53, Issue 10, Pages: 40-47(2025)
    • DOI:10.12473/CPM.202409047    

      CLC: TE925
    • Received:07 September 2024,

      Revised:2025-06-28,

      Published:10 October 2025

    移动端阅览

  • Zeng Bo,Li Rui,Shen Cheng,et al.Safety evaluation method for casing running in deep shale gas horizontal wells[J].China Petroleum Machinery,2025,53(10):40-47. DOI: 10.12473/CPM.202409047.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

35

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

High-frequency Plunger Lift Process for Deep Shale Gas Wells
Development and Application of Safe and Efficient Casing Running Device for Horizontal Wells
Analysis on Dynamic Friction Torque of Drill String in Deep Shale Gas Horizontal Wells
Exploration and Practice of “One Trip” Technology for Deep Shale Gas Horizontal Wells
A Real-Time Boundary-Detection Inversion Method Based on LWD Electromagnetic Wave Resistivity

Related Author

Liu Tong
Ni Jie
Ku Erban
Xu Jian
Jiang Jinhong
Li Xianyi
Zhao Heqian
Mi Kaifu

Related Institution

Engineering Technology Institute, Sinopec Southwest Oil & Gas Company
Zhundong Oil Production Plant, PetroChina Xinjiang Oilfield Company
State Key Laboratory of Oil and Gas Reservoir Geology and Exploitation, Southwest Petroleum University
Beijing Petroleum Machinery Co., Ltd.
西南石油大学机电工程学院 西南石油大学地热能研究中心 中国石油集团川庆钻探工程有限公司
0